Method for Improving Performance of Composite Geomembrane

In the process of repairing water conservancy buildings, composite geomembrane is usually used for building anti-seepage. In order to ensure that the performance of composite geomembrane can be further improved, we need to pay attention to certain matters when using it, then how to use it In order to further improve the performance of the testing method of geomembrane tensile force?

The splicing quality is the key to determine the success or failure of the anti-seepage performance of the composite geomembrane. The splicing method is usually constructed by hot-melt welding. The membrane and the membrane are generally welded by a dual-drive self-propelled geomembrane material and its benefits welding machine. The welding seam overlap width is 10cm. There is a cavity of 10mm width between the two welding seams. T-shaped stitching of polyester thread in a portable packer.

Note that before formal welding, test welding should be performed according to the climate characteristics of the construction area to determine the walking speed and welding temperature. During the construction process, the walking speed of the welding machine should be controlled at 0.8 ~ 1.2m / s, and the welding temperature should be 240 ~ 260 ℃, to ensure that the welding quality of the composite geomembrane meets the design requirements.3

Method for Improving Performance of Composite Geomembrane

Before welding, it is best to lay a long wooden board under the seam of the geomembrane, so that the welding machine can walk on a flat base to ensure the welding quality. In addition to the quality of the material, if you want to further improve the performance of the composite geomembrane, you must work hard during construction. In order to facilitate the construction and ensure the quality of the splicing, the composite geomembrane generally adopts a wide width to reduce the amount of splicing on-site.

Before construction, according to the needs of the width of the material and the length of the site, the appropriate length should be cut in the factory, and spliced ​​into blocks that meet the required size and rolled into rolls. A composite layer of about 10 cm is reserved on both sides so that the main properties of geomembrane is connected laterally. When the weld is sheared, the damaged area mainly occurs in the weak area of ​​the weld area and the connection, so it should be paid enough attention to the construction of the weld.